Transcript detail

Loading...

Public transcript context with linked callsigns, related nets, and analysis metadata.

Back to transcripts
-Node
-Created
-Confidence
-AI Passes
-Analysis Steps

Transcript

Public transcript text

All right, great. All this month, every Monday, I will be headed to Iowa. And once the month is over, the first full week of November and the second full week, I'm headed down to Florida to do a parachute jump with some old friends. But yeah, the the Lernetorium is just about there. This week, I finished the in-ground grounding system. All the wires laid, all the ground rods are down. All of that stuff's been buried, except for a couple of places where I needed to leave it exposed because I have to tap into it. I'm putting an additional ground on one of the tower legs. I mean, they say ground all three tower legs, but it's like, it's metal. It's all one piece. Why ground it in three places when I only need to really ground it one but so I got to tie in that. And then the grounding box where the panel goes where all the lightning arrestors are, that's completed. And let me reset. I just have to get that mounted onto the exterior wall of the Lernetorium and get the cable and wires routed in and everything wired up and then the inside of the shack grounded. But that'll be this week and probably Thursday and Friday of next week, getting ready for the big contest. We'll seek your worldwide foam contest is the weekend of the 25th. But and then in my spare time, I got to put all the firewood I split 16 face cords, I got to get all that put into my woodshed because it is quickly coming up on wood stove season were probably by the end of this week, going to be a peak foliage. A little bit of mist this morning. But the foliage is looking really good. And you know, just kicking along doing my thing. So that's all we got. I might listen along for a while, but I'm gonna want to done great. W2A back to you.

Explore

Linked public records