Transcript detail

Loading...

Public transcript context with linked callsigns, related nets, and analysis metadata.

Back to transcripts
-Node
-Created
-Confidence
-AI Passes
-Analysis Steps

Transcript

Public transcript text

Well, during the summer they do the engine runs once a month at least and then when fall comes around I think the one two weeks ago was the last one where they'll haul the planes out of the hangar and they'll be stored safely inside now for the upcoming winter and strong winds and blowing snow etc. etc. So not as much during the winter time as there is during the summer as far as events go. But hopefully with the VA6BCM call sign in place now and they also just put up an HF antenna and fed half-wave wire. So we may actually get the Lancaster transmitter and receiver on the air more than just into a dummy load. So we'll see what happens over the winter. We'll try and get a few things sorted out and then have at it again at some of the events over next summer. Back to you Dave from V6 PLC.

Explore

Linked public records