Transcript detail
Loading...
Public transcript context with linked callsigns, related nets, and analysis metadata.
Transcript
Public transcript text
5-D-Clearlessly, thanks. Hit 5-0-8-G-K-G-5-BST on the other side. Temporary Control Operator, which is and cancelled the EcoLink, drop the link and make this either a valve or a wall or use. 7-3-G-BST on the other side.
Explore