Transcript detail

Loading...

Public transcript context with linked callsigns, related nets, and analysis metadata.

Back to transcripts
-Node
-Created
-Confidence
-AI Passes
-Analysis Steps

Transcript

Public transcript text

Well, talking about the rapids there, Schwabkelegg and the Aishik plant and the Mayo A and the Mayo B projects there, it says here, these three systems, all owned by Yukon Energy Corporation, are the backbone of the territory's renewable generation. Over 90% of Yukon's electricity is consistently renewable thanks to them, and indeed, thanks to them. Well, that's really, really quite amazing. I've been to some hydroelectric projects in B.C. and they are just massive. I don't know, maybe I've been to a dam site for a while, but when I was there last time, it was like, wow, this thing is huge. Then I remember Grand Coulee Dam. Anyway, Michael, you have a great afternoon, great day, and good luck, or good duck, maybe, you could have some roasted duck on the boat or something. Good luck with the Klondike road break. I don't know how that all goes. All right, let's take some more stations, current time 1229 here in the shack. I'm Jack, KI7RMU. If you'd like to join us, come ahead, call, sign, and name.

Explore

Linked public records