Transcript detail

Loading...

Public transcript context with linked callsigns, related nets, and analysis metadata.

Back to transcripts
-Node
-Created
-Confidence
-AI Passes
-Analysis Steps

Transcript

Public transcript text

many years but AOS tough deal. I've been waiting for even started bumping there. I'll be back to my probably 20 big 20. Anyway, I entertain you. I won't be a kind of a masherator. I was I put a static system in public most plastic ones and drain fields. I don't know if you guys do waste stuff but I might have to contact you for some for some guidance. I know it was a quarter inch of put slope on the drain lines. I don't know if the great field probably something similar. Probably a hundred thirty hundred sixty feet. That'd be suitable for a three bedroom with the leech line. The holes in it. Three or four inch stuff whatever it is. Leech lines and then gravel then you put the mat in.

Explore

Linked public records