Transcript detail
Loading...
Public transcript context with linked callsigns, related nets, and analysis metadata.
Transcript
Public transcript text
And he gave us his design literally, it was well up in, you know, sketched out by a three year old. What he wanted. And so we were having fun with that. We ended up building this two days. It wasn't anything like what he was on his piece of paper, but it worked. We saved the day and everybody was happy. But just the idea that, you know, it's supposed to be an engineering drawing we're getting here, not a, not something on a cocktail napkin. That's funny. Alright Dean, I need to get out of here. That is the building. So we'll catch you later. Alright, catch you later Jeff, have a good one. It was 10-7Xs. K-7X RC. I don't think the type of engineer you get may have something to do with how much your company's willing to pay for the engineer. It's a competition around here, paid $200,000.
Explore