Public transcript text

I could go either way on at this point. KF-68, back to you. So you said it was a big day. Do you think you're going to be able to get all the electrical work done? Realistically, no. I mean, I can problem it. So the get in the inverter charge or mounted is number one. Then stringing wires to it. Well, stringing wires over to where the battery is going to go is the second part. And I could string wires from the inverter charge over to the electrical panel for the AC, but I can't tie into it until the battery is working. So I may string the wires and leave them taped off or something in the panel. But I do have that wire. And I have all the stuff in the inverter charge and the wires over to the batteries. The problem is the battery is not the same as the battery.