{"ai_pass_count":3,"analysis_step_count":5,"confidence":0.8017336336726493,"created_at":"2026-08-24T05:01:12.163033+00:00","id":250770,"node_number":"SDR9494","processing_time":2.309605121612549,"recent_steps":["callsign.qrz_verify","callsign.llm_extract","crawler.extract_candidates","callsign.regex_extract","transcription.whisper"],"recording_id":264616,"text":"It wasn't really bad. My ass, I mean it was S5 or whatever, but yeah they came and fixed them and then the noise level dropped so You know those guys out there, I think it's PSE that's out there You know they do a pretty good job on the lived in Stolmish. It was the same thing. I was having some issues Besides the BPA Bible Power Administration had a huge I don't know how many kilowatt lines that were over the valley out there. I couldn't hear anything on one sixty during the rain when it would rain There's really nothing I could do about it and There was a couple people didn't know it wasn't raining. HF was nice and quiet And that stuff so I bought a couple of poles and then Much company PUD came out and fixed them and called me back a bit of fish That was really cool I"}