{"ai_pass_count":5,"analysis_step_count":14,"confidence":0.6642235894997914,"created_at":"2026-07-16T15:18:05.383306+00:00","id":164734,"node_number":"SDR9494","processing_time":1.9429357051849365,"recent_steps":["net.store_session","callsign.qrz_verify","net.llm_structured_analysis","net.rules_detect","net.context_window"],"recording_id":168792,"text":"Maybe if it's a little bit short. Alright. We need to fix the trace. I'll show you later. It's better. For a mobile shot. Here's an easy year to go over there. Make sure everything's set up right and they start making the part right. They leave it within three months. It's back out of spec again. So there's a lot of companies go through that including some of their transistors and stuff that require heat sinks. They're not even machined right now over heat. Companies send people engineers over there to get everything back on track. And within a month to three months is right back to what it was before. They're famous for that."}