{"ai_pass_count":6,"analysis_step_count":18,"confidence":0.4482746720314026,"created_at":"2026-07-16T09:02:01.846123+00:00","id":163710,"node_number":"SDR9494","processing_time":1.7889158725738525,"recent_steps":["net.store_session","net.store_session","callsign.qrz_verify","net.llm_structured_analysis","net.rules_detect"],"recording_id":167670,"text":"right here, right in front of the cove photo, and the rud premate should be set accordingly together on three valve tracks into the header abacus construction oneractor used for 18 inches grade water after the trough on an beginning design"}