{"ai_pass_count":4,"analysis_step_count":13,"confidence":0.6684703550168446,"created_at":"2026-06-24T14:45:03.211197+00:00","id":121286,"node_number":"683210","processing_time":1.807541847229004,"recent_steps":["callsign.qrz_verify","callsign.llm_extract","callsign.regex_extract","net.store_session","net.llm_structured_analysis"],"recording_id":121285,"text":"break net. And up to Grass Valley, upside-cling central organized though. Good morning, Gradydon, KC6SLL. Good morning to the net. Good morning to Brian. I was curious, Brian, whether you had seen the announcement, the partnership between Microsoft, Chevron, I think the company is called Cholint. But to build that huge data center in Texas they're talking about, and I was just amazed because once the data center is built out, they project up the load for the data center will be 2.7 gigawatt-hours. And I said gigawatt-hours, not megawatt-hours, just to put that in perspective, the total maximum output of the application."}